Transportation resumes after Bailey bridge is built

14, Dec 2020 | nepaltraveller.com

The transportation service here was disrupted for nearly six months in the lack of a bridge over the river.

RSS

UDAYAPUR

Transportation has resumed from Sunday on the route linking Gaighat in Udayapur district to Diktel in Khotang district after a Bailey bridge came into operation over the Sunkoshi River that flows through Udayapur and Khotang districts. The transportation service here was disrupted for nearly six months in the lack of a bridge over the river. Now the Bailey bridge is installed over the River, the locals could commute easily, said Himali Transportation Entrepreneur Association coordinator, Parmeshwor Ghimire. The Bailey bridge was removed in May with the increase of water level in the River. The Regmi Construction Company has been awarded a contract to build a Bailey bridge from the mid-November at the cost of Rs 8.5 million. The Bailey bridge would measure 50 meters in length and 6 meters in width. 

ALSO READ

Jordan Declares its First Marine Reserve in Red Sea

Valley's Temperature Dips to 4 Degrees Celcius

Crocodile Breeding Centre in Chitwan in potent need of Male Crocodie

Wild Elephant Kills One in Sunsari

Lower Humla Gets Connected with National Road Network

Decision to be made on Ranke-Rabi-Bhedetar Road

Mero Nepal Day in Germany

PM's Call to Recognize the Value of Himalayas

Endangered Royal Bengal Tiger Spotted in Illam

Zipline Service in Kusma

join our newsLetter

powered by : nepal traveller digital publication pvt. ltd

developed by : Web House Nepal