Transportation halts after the bridge subsides

29, Jul 2021 | nepaltraveller.com
Source::RSS

A bridge over a stream near Maithal Training Centre subsided with the floods triggered by the landslides on Wednesday which resulted in obstruction of transport

RSS

The incessant rainfall that occurred for some days in Nuwakot caused floods and landslides in various parts.

A bridge over a stream near Maithal Training Centre subsided with the floods triggered by the landslides on Wednesday. It resulted in the disruption of transportation from Battar to Bidur, the district headquarters. Even the vehicles heading to Rasuwa are now stranded at Battar.

The floods eroded the land below the bridge causing the bridge to collapse at 9:00 pm Wednesday. Police Inspector Lalita Dhakal from District Police Office informed that even the way towards Battar from the Maithali barrack has been obstructed

It has caused a great inconvenience to the people. There is no alternative road to continue connectivity between Bidur and Battar. So repair and reconstruction of the damaged road are imperative. 

Chief of Division Road Office, Narayan Datt Bhandari, however, informed that efforts were underway to resume the transportation with the repair and reconstruction of the road. Mobilization of human resources and machines is underway, he added. 

ALSO READ

Vero Cell's Booster Dose For Elderly To Be Administered From Today

Impact Of Monsoon Wind: Rain Forecast For Three More Days

Landslides Disrupt Several Roads In Sankhuwasabha

Kenya Banking On African Market To Shore Up Tourist Arrivals

Nepal Aims To Export Power After Inaugurating Largest Power Project

Most COVID Restrictions Set To End In England On July 19, Says PM

join our newsLetter

powered by : nepal traveller digital publication pvt. ltd

developed by : Web House Nepal