Source::RSS
CHITWAN
RSS
The Narayangadh-Muglin road section that was blocked by landslides at 16 Kilo area in Chitwan district on Tuesday has come under operation after the landslide debris was removed.
One-way traffic movement has resumed in the road section from 7:45 pm last night, informed Division Road Office, Bharatpur’s engineer Bijaya Darai. The Division Road Office mobilized two excavators and two loaders to remove the debris, shared engineer Darai.
A huge rock had fallen along with the rain-triggered landslide nearby Baluwa Pul at Bharatpur Metropolitan City ward no 29 obstructing the road.
ALSO READ :